Project Overview
- Case Study: Campus Uplift
- Technology: Networking (1700 Routers/Switches)
- Market: Education
- Project Duration: 10 Months
- Number of Locations: 227 Campus Locations
Customer Challenge
One of the largest national universities was faced with the task of upgrading their network technology. This upgrade process included: site surveys, network planning, wireless planning, routers/switches, and cabling. In addition, the project required a partner capable of throughly training each delivery team to insure that all of the upgrades were completed in a timely, uniform, and consistent manner.
Worldlink Solution
- detailed site survey visit with pictures and serial/model numbers
- de-installation and disposition of existing networking equipment
- equipment installation, testing, and turn-up
- onsite CCNA Network Technicians to assist with upgrade/configuration of routers and switches
- detailed post installation documentation with pictures and serial/model numbers
- participation in weekly team management meetings
Customer Testimonial
“The improvement to the…student experience has been immense and everyone should be proud of what was accomplished. I want to thank every one of you for your hard work, long nights and dedication…It was an amazing thing to watch and I’m really proud of the entire team.” G.M.- Senior Manager