Project Overview

  • Case Study: POS Cabling
  • Technology: Point of Sale System – Cabling
  • Market: Retail-Department Store
  • Project Duration: 6 Months
  • Number of Locations: 300 Nationwide

Customer Challenge

In preparation of a nationwide large scale POS deployment, one of the largest Department Store chains in the US desired a single partner to install up to 25,000 cable drops at 300 of their department stores.

Worldlink Solution

  • site survey
  • utilized Just-in-Time delivery system to complete work before store opening
  • provided new MDF and IDF equipment
  • installation of fiber and category 5 cabling
  • utilized online service portal for troubleshooting and checkout

Customer Testimonial

“Worldlink worked effectively with our IT team and was a major contributor to the success of this important project.”  T.W. – Project Manager