Project Overview
- Case Study: POS Cabling
- Technology: Point of Sale System – Cabling
- Market: Retail-Department Store
- Project Duration: 6 Months
- Number of Locations: 300 Nationwide
Customer Challenge
In preparation of a nationwide large scale POS deployment, one of the largest Department Store chains in the US desired a single partner to install up to 25,000 cable drops at 300 of their department stores.
Worldlink Solution
- site survey
- utilized Just-in-Time delivery system to complete work before store opening
- provided new MDF and IDF equipment
- installation of fiber and category 5 cabling
- utilized online service portal for troubleshooting and checkout
Customer Testimonial
“Worldlink worked effectively with our IT team and was a major contributor to the success of this important project.” T.W. – Project Manager